Protection Coordination: TVS, eFuse and PPTC
TVS clamps in nanoseconds, an eFuse limits in microseconds, a PPTC trips in seconds. Coordinate the three thresholds and the chain works.
Read articleCouldn't load pickup availability
1.1µA 30µs low CMOS 1 6V SSOT-24 surface mount, adhesive mount
| Manufacturer | TOREX Semiconductor |
|---|---|
| Manufacturer Part Number | XC6119C29ANR-G |
| IC Category | RF Integrated Circuits |
| Package | SSOT-24 |
| Lifecycle Status | Active |
| Supply Voltage | 6V |
|---|---|
| Source Parameters | 1.1µA 30µs low CMOS 1 6V SSOT-24 surface mount, adhesive mount |
Inventory and pricing are updated regularly. Technical data is provided for engineering reference.
MANUFACTURER ACCESS
Browse frequently requested semiconductor and electronic component manufacturers, then search the catalog or submit an RFQ for the exact part you need.
From the desk
Market signals, technical notes, and practical sourcing guidance for semiconductor procurement.
TVS clamps in nanoseconds, an eFuse limits in microseconds, a PPTC trips in seconds. Coordinate the three thresholds and the chain works.
Read article
Shunt sensing accuracy starts with the drop, the power and the Kelvin layout; offset and thermal EMF set the rest.
Read article
Learn why threshold voltage does not prove a 2N7002 is fully on. Compare manufacturer limits, check the pinout and qualify a replacement for your actual gate...
Read article
RS-485 is a physical layer; CAN adds arbitration and error handling. Distance, node count and determinism decide which one fits.
Read article
The buck input capacitor carries pulsed current. Size RMS, ripple and DC-bias derating before choosing a part.
Read article
A PPTC is selected at the hottest ambient, not at 25 C. Hold current, trip time and voltage drop are what decide the part.
Read article
Two numbers decide it: voltage difference times current. Below 1 W an LDO is simpler and quieter; above it the heat has nowhere to go.
Read article
A TVS is chosen by four numbers in a specific order. Standoff above the rail, clamp below the IC limit, enough peak current, and capacitance that...
Read article